Storm Water Upgrade Project

Front-end engineering and detailed engineering, for the installation of new pumps, piping, including collection headers, and modification of existing storage facilities to improve storm water handling and capacity

Marathon’s AMP Program

DCS modernization from Honeywell Hiway to Experion, Compressor and Heater protection/control upgrades to meet Marathon’s RSPs. This includes piping and civil/structural scope.

Coker Valve Switch Project

Front-end engineering and detailed engineering, including equipment specifications, piping, civil/structural design, I&E design, applications and graphics development, staging and testing, and commissioning support for the modification of 144 MOVs   

Boiler / Furnace BMS Upgrade

Engineering design including equipment specifications, fuel gas piping, I&E design, applications and graphics development, testing and commissioning for 3 boilers and 1 furnace Burner Management System upgrades.  All engineering and design was completed to national regulatory (CSA B149.3, NFPA 85/86) and local regulatory field approvals

Stabilizer Facilities Main Automation Contract

All electrical engineering and design for both facilities as well as engineering, design, fabrication, integration and commissioning of 12 power and control skids across the two facilities

MARS Honeywell Upgrade

Engineering project to upgrade client’s mission critical obsolete Honeywell oil movements and storage applications with new Honeywell Experion C300’s and profit blending and movement (PBM)