Storm Water Upgrade Project
Front-end engineering and detailed engineering, for the installation of new pumps, piping, including collection headers, and modification of existing storage facilities to improve storm water handling and capacity
Stabilizer Facilities Main Automation Contract
All electrical engineering and design for both facilities as well as engineering, design, fabrication, integration and commissioning of 12 power and control skids across the two facilities