Marathon’s AMP Program

DCS modernization from Honeywell Hiway to Experion, Compressor and Heater protection/control upgrades to meet Marathon’s RSPs. This includes piping and civil/structural scope.

Coker Valve Switch Project

Front-end engineering and detailed engineering, including equipment specifications, piping, civil/structural design, I&E design, applications and graphics development, staging and testing, and commissioning support for the modification of 144 MOVs   

Boiler / Furnace BMS Upgrade

Engineering design including equipment specifications, fuel gas piping, I&E design, applications and graphics development, testing and commissioning for 3 boilers and 1 furnace Burner Management System upgrades.  All engineering and design was completed to national regulatory (CSA B149.3, NFPA 85/86) and local regulatory field approvals